Recommended Products
 
Products quick link
 
Jobs
 
Downloads
 
Contact Us
 
Mail Login
Home » News » KLK News » Start of construction of the third stage of KLK
 
Start of construction of the third stage of KLK
[ Font Size:Zoom Out  Zoom In ] 2009/07/28 14:43

Aiming at adjusting the structure of the products and being bigger and stronger, the projects of the third stage of KLK started the construction in July 2009. The present stage would give emphasis on developing the reserved land of 36,666 square meters specially and the designed construction area is 20,000 square meters. It is mainly for the high-temperature alloy collection and separation, the atomization treatment of copper and cobalt alloy, the collection of waste battery materials, R&D center and the staff’s training center.

Email To Friend       Print       Back       Top
 
 
© 2004-2010 Jiangsu Cobalt Nickel Metal Co., Ltd. (KLK)
TEL: 0086 (0) 523 87670966  FAX: 0086 (0) 523 87671121
Binjiang Road, Economic Development Zone of Taixing City, Jiangsu Province